If you remember way back in January when I put Hearts & Wreaths into the quilting frame, I didn't put the full quilt into the frame.
Since the quilt is slightly more than halfway quilted, I put that portion of the quilt into the frame. It's not hard to do, just unpin, adjust and pin again. Here are pictures of the adjusted quilt.
The quilting frame had been at the west of the basesment, now it's been moved to the east end under more LED lights that have been installed. I've included scrappy sprouts in this photo. Those things you see hanging from the ceiling are part of some decorations the former owners had left. The farmer yanked them down but the ends didn't come. When son 2 comes, I'll have him remove them. He's tall and can reach them without a ladder.Here is just the quilt.
A side view of the quilt.My plan for quilting is to go around the quilt and quilt the outside border. That takes longer than the inside blocks. It does get rather boring at times but that's why I watch movies on my ipad. Years ago, in the farm house, our TV was on a stand with wheels. I was able to turn it around and watch TV while I stitched which was very convenient.
I know that corner looks slightly puckery, it will be fine once the border is rolled. Overall, I've been pleased with the side tension with this frame.
There will be no post from me next Sunday, I'll be at the Jane Stickle Retreat in Shipshewana!
Just a reminder, I have problems with Mail Chimp delivery. If my Sunday/Thursday posts aren't delivered to you via email, just type gretchenslittlecorner.blogspot.com into your browser. Or bookmark me!
Linking to Kathys Slow Stitching Sunday, Stitching Stuff, Oh Scrap, Handmade Monday, Sew & Tell, Craftastic Monday, Design Wall Monday, Monday This 'N That, Monday Musings, To Do Tuesday